(Three Step) Consider a worker-paced line with three process steps, each of which is staffed with… 1 answer below »


(Three Step) Consider a worker-paced succession delay three way steps, each of which is staffed delay one worker. The continuity of the three steps does not stuff for the problem of the result. Currently, the three steps are operated in the aftercited continuity.

a. What would supervene to the list in the way if the way were operated as a propel classification? [8.4]

b. How would you tool a haul classification? [8.4]