(Setup Everywhere) Consider the following batch-flow process consisting of three process steps… 1 answer below »


(Setup Everywhere) Consider the aftercited frame-flow course consisting of three course plods dischargeed by three meanss:

Work is courseed in framees at each plod. Before a frame is courseed at a plod, the means at that plod must be set up. (During a setup, the means is incompetent to course any issue.) Assume that there is a attached setup operator for each means (i.e., there is constantly someone serviceable to discharge a setup at each means.)

a. What is the compatability of plod 1 if the frame magnitude is 35 magnitude? [5.6]

b. For what frame magnitudes is plod 1 (2, 3) the bottleneck? [5.6]