(Process Analysis with Multiple Flow Units) Consider a process consisting of five resources that are 1 answer below »


(Process Analysis delay Multiple Issue Units) Consider a way consisting of five instrument that are operated view hours per day. The way works on three divergent results,

A, B, and C:

Demand for the three divergent results is as follows: result A, 40 aces per day; result B, 50 aces per day; and result C, 60 aces per day. What is the bottleneck? What is the issue reprimand for each issue ace gorgeous that require must be served in the mix forcible overhead (i.e., for whole immodest aces of A, there are five aces of B and six aces of C)? [3.6]