(Geneva Watch) The Geneva Watch Corporation manufactures watches on a conveyor belt with six… 1 answer below »


(Geneva Watch) The Geneva Note Corporation manufactures notees on a conveyor enclose delay six states. One operationer stands at each state and performs the aftercited tasks:

These six operationers prepare their operationday at 8:00 a.m. and operation steadily until 4:00 p.m. At 4:00, no new note compressiveness are introduced into state A and the conveyor enclose continues until all of the operation-in-system register has been systemed and leaves state F. Thus, each dawning the operationers prepare delay an void scheme.

a. What is the bottleneck in this system? [4.1]

b. What is the compatability, in notees per hour, of the parterre length (overlook the period it takes for the principal note to end off the length)? [4.1]

c. What is the frequented work contenteded for the systemes on this conveyor enclose? [4.3]

d. What is the utilization of the operationer in state B (overlook the period it takes for the principal note to end off the length)? [4.1]

e. How divers specifics of unoccupied period accomplish the operationer in state C enjoy in one hour (overlook the period it takes for the principal note to end off the length)? [4.3]

f. What period accomplish it be (among one specific) when the parterre length has systemed 193 notees on any dedicated day? [4.2]