Determine the number of CHB, total volume of mortar needed, number of bags of cement and the volume.


Determine the enumerate of CHB, completion quantity of mortar needed, enumerate of bags of bind and the quantity of sand L = 5.80m S = 4.80m Column: C = 300mm ,C = 300mm Footing: B = 1.50m, B = 1.50m t = 0.28m Wall Footing: W = 0.40m, t = 0.25m Beam: b = 300mm, t = 350mm Slab = 100mm H1 = 2.90m H2 = 2.50m