An engineer has received two bids for an elevator to be installed in a new building. The bids, plus.


An engineer has current two bids for an elevator to be installed in a new structure. The bids, plus his evaluation of the elevators, are shown in Table P5-69. The engineer gain fabricate a introduce rate decomposition using a 10% share rate. Prepare the decomposition and detennine which bid should be accepted.

Table P5-69.